Read more details here @ Houses Magazine.
Central Auckland residential sites are in hot demand and are reaching record prices. These projects often face difficulties with layers of
Stage two of The Edge ASB Theatre refurbishment is due to start in December 2012 and involves replacement of the circle seating, handrail upgrades and
Archoffice was the selected architect to provide a concept design for Te Rangi Recreation Facility. The plan has been designed with flexibility and po
This project involves the demolition of the existing house which was constructed in 1975. Demolition in Res 1 zones is allowed in this case because h