The Clients approached Archoffice to discuss options to renovate their newly purchased house in St Heliers. Archoffice’s initial response addressed their need for additional space by providing a new floor level above the existing garage for the kids bedrooms, a new bathroom and playarea. This enabled the existing first floor to become a master suite with walk-in wardrobe, ensuite and stunning views to Rangitoto Island. From the street the strong clean lines of the two intersecting gables creates a bold statement with street presence. Downstairs two small extensions meant the living areas could be rearranged to gain a better relationship with one another and allowed for a new contemporary kitchen, living & dining.
Stage two of The Edge ASB Theatre refurbishment is due to start in December 2012 and involves replacement of the circle seating, handrail upgrades and
Archoffice was the selected architect to provide a concept design for Te Rangi Recreation Facility. The plan has been designed with flexibility and po
This project involves the demolition of the existing house which was constructed in 1975. Demolition in Res 1 zones is allowed in this case because h
Our initial designs responded to our clients brief by creating a contemporary rear addition clearly contrasting with the traditional villa. Two offset